Procedure for waterproofing using bituminous waterproofing membrane

The waterproofing membrane comes on-site in the form of rolls manufactures and packed in the factory properly sealed. The specifications and safety manuals of these membranes provided by the manufacturer should be read before the installation process. Fire safety and prevention is the most important while using this membrane.

The bituminous waterproofing membranes are unfolded on the site and laid firmly on the surface with tar-based adhesives using blowtorches. These membranes have 2 to 4 mm thick waterproof materials. A membrane should be flexible with elongation 150 % to cover any small cracks, strong, chemical & UV resistant, flexible enough to take any shape over which it is laid.

1. Surface Preparation

The surface to be membrane should be clear from dirt, dry and clean. Must not be installed during adverse weather and below 450 F. For slope up to 3 inches the membrane should be laid perpendicular to slab and more than 3 inches slope should be laid parallel to the slope. This ensures that water is never be running at a joint lap edge.
Bituminous Waterproofing

Concrete Substrate: Smoothing

The surface must be smoothed with a trowel and any cracks or dips must be filled with mortar. Any roughness must be removed, as must any remains from building work, such as nails, metal sheets, timber, etc.
Bituminous Waterproofing Suppliers in Sharjah

Concrete Substrate: water, Ice, Curing

Before application, the substrate must be clean and dry. In the case of concrete and hollow-core substrates, it is advisable to allow a curing period of 8 days to 3 weeks, depending on the season, before laying.
Bitumen Suppliers in Sharjah

Concrete Substrate: Primer

Spread the bituminous adhesion primer. The bitumen polymer membranes must not be applied until the primer is completely dry: about 8 hours
Waterproofing Material Suppliers in UAE

Sheet Metal Substrate

If the membrane is to adhere to sheet metal, spread primer and wait for it to dry before moving on to laying the membrane.
Waterproofing Procedure

Timber Substrate

Spread the bituminous adhesion primer. On timber boarding, sheets of bitumen paper or ROLLBASE should be nailed down with large-headed nails to protect the timber from the burner flame. The membrane should then be fixed with complete adhesion.
Bituminous Waterproofing

Substrate Over Old Membranes

If the condition of the old membrane allows it to be retained, it can be used as a substrate. First, however, remove unstable and perished parts, separate any protective sheet metalwork and flatten any bubbles, etc. Apply a coat of primer before fixing the membrane.

2. Roll Alignment

3. Flame Laying

Waterproofing membrane

Flaming

As the heating proceeds, the Flamina film retracts and the talc-coated face darkens until it takes on a bright appearance and any embossing flattens out, the surface becomes shiny and the membrane is ready for adhesion to the substrate and on the overlaps. Flame heating must bring about retraction of the film and flattening of the embossing, but heating the membrane any further can damage the polyester reinforcement (which melts at 260°C) causing it to retract, undulate, curl or in the most serious cases to puncture. Insufficient heating, on the other hand, can cause insufficient adhesion to the base, between the layers or on the overlaps.
Waterproofing Membrane Suppliers in UAE

SBS

Reinforcement of the membrane is affected, weakening it; also, the upper protective layer is removed and the reinforcement is left exposed. Often the operator tends to carry out a perfunctory weld on 10 cm of overlap and then rely almost completely for the seal of the membrane on giving it a “good filling”, not taking into account that the adhesive strength of 1 or 2 cm of filling is insufficient for sealing the joint. In short, it is a waste of time to do a useless job twice on the overlap. It is quicker and safer to carry out the welding correctly the first time, while unrolling the roll, releasing the stream of melted mixture once to make a permanent job.
Avoiding Puncturing: Use suitable footwear to avoid perforating the waterproofing membrane

4. Flame-Laying on vertical surface

Best Bitumen Suppliers in UAE
Bituroll membranes have excellent resistance to sliding under heat and do not slip even when fixed vertically to concrete surfaces. Using the flame to heat both the membrane and the surface to which it is to adhere will result in tenacious adhesion without the need for mechanical fixings. The material’s grip is produced by cooling, when the mixture in the melted layer returns to the solid state. It can happen in the summer months that both the membrane and the entire substrate are so hot that it takes a long time for sufficient cooling to occur for the material to get a grip on the vertical surface and become self-supporting. The operator must therefore control the heating carefully and in the summer months will have to support the sheet manually a little longer till it has begun to get a grip, in other words till it has cooled down. If this is not done, a sheet which is still too hot will not remain attached to the wall and will fall down. It is therefore important to wait for cooling to take place and not to give in to the temptation to reheat a sheet which has become detached because the operator did not wait long enough, otherwise it will never cool and he will never succeed in making it adhere to the vertical surface.

5. Paint

Best Waterproofing Company in UAE
Spread the protective paint using a roller, taking care to apply two coats at right angles to each other. For detail work, use a brush. The presence of uneven areas on the roof, leading to the formation of puddles, can locally cause the paint to lift. Do not paint areas of the membrane which are perpetually immersed in water. Painting over a mineral-covered membrane ensures considerably longer life than on a smooth membrane.